Generalities – Osmose h2020 Thu, 13 Jan 2022 10:06:12 +0000 fr-FR hourly 1 The functional tests related to task 7.1 have been finished at R&D Nester laboratory in Portugal! /the-functional-tests-related-to-task-7-1-have-been-finished-at-rd-nester-laboratory-in-portugal/ Thu, 13 Jan 2022 10:06:12 +0000 /?p=1809 Read more The functional tests related to task 7.1 have been finished at R&D Nester laboratory in Portugal! ]]> WP7 worked on enhancing the engineering process to improve the IEC 61850 standard, with a dedicated demonstrator and a set of functional tests.

The functional tests related to task 7.1 (interoperability) have been finished at R&D Nester laboratory, in Portugal, where the demonstrator for this task is installed.
The interoperability is the ability of two or more devices from the same manufacturer or different manufacturers to work together in a system, with the correct execution of its functions. The international standard IEC 61850 was developed to allow interoperability in electrical substations and other power system facilities.
The demonstrator simulates two substations and the transmission line between them. In each substation, there are devices from several manufacturers, executing control and protection functions.

(Credits: R&D Nester)

In task 7.1, a new engineering process (required steps to configure a system) was developed, in line with the future part of the standard IEC 61850-6-100, to which OSMOSE project is thus contributing.
The executed tests ensure that the engineering process was well applied, by checking that the implemented functions are performed according to the specification.

To learn more about the enhancement of the IEC 61850 standard, we invite you to register to our webinar.

]]>
OSMOSE panel session at the ISGT Conference 2021 video is available /osmose-panel-session-at-isgt-conference-video-available/ Thu, 25 Nov 2021 11:09:52 +0000 /?p=1714 Read more OSMOSE panel session at the ISGT Conference 2021 video is available ]]> Dear OSMOSE community,

We are happy to inform you that you can now watch the OSMOSE panel session that was held during the ISGT Conference 2021 . Please find the link to the video here or go to our project videos section in the OSMOSE Ressource Center to watch the video and learn more about Battery Energy Storage Systems (BESS) to support the power network and the demonstrations in OSMOSE.
Many thanks to the speakers: Yves-Marie Bourien from CEA, Prof. Mario Paolone from EPFL, Jean-Yves Bourmaud from RTE and PhD. Alberto Escalera Blasco from REE.
We hope that you enjoy the presentation!

Read the Pdf presentation here

]]>
WP4 Demo: Successful Factory Acceptance Test for the statcom, supercapacitors and DC-DC converter /wp4-demo-last-september-factory-acceptance-test-were-successfully-developed-for-the-statcom-supercapacitors-and-dc-dc-converter/ Thu, 21 Oct 2021 14:09:01 +0000 /?p=1668 Read more WP4 Demo: Successful Factory Acceptance Test for the statcom, supercapacitors and DC-DC converter ]]> The OSMOSE demo 4 relies on a hybrid flexibility device that combines a battery (completed and verified), a STATCOM and supercapacitors to provide stability support services. The Factory Acceptance Tests have just been achieved with success on the STATCOM plus supercapacitors container and DC-DC converter.

All equipment are now installed at Centro Nacional de Energías Renovables (CENER) – National Renewable Energy Centre site, and their integration is ongoing. The SCADA and the Master control that will coordinate the different devices are now fully developed, and the different control strategies have been defined for testing. The next steps are field operation of the demonstrator and evaluation of the functionalities.

More info on the demo

]]>
WP5 demo: Upgrade of industrial loads, RES plant and grid devices /wp5-demo-upgrade-of-industrial-loads-res-plant-and-grid-devices/ Fri, 02 Jul 2021 07:07:18 +0000 /?p=1622 Read more WP5 demo: Upgrade of industrial loads, RES plant and grid devices ]]> Within the OSMOSE project, WP5 demonstration led by TERNA targets multiple grid services for the Italian grid based on coordinated RES, Demand Response and dynamic thermal rating (DTR).

The zonal Energy Management System (EMS) is now deployed in Terna’s operational environment. The Dynamic Thermal Rating (DTR) installation is completed, as well as the related software installation on master nodes (by ENSIEL) and the data integration in Terna system (Terna, Enel Green Power, IBM).

Partners TERNA, ABB, Enel Green Power, e2i and ENSIEL released in May 2021 the confidential deliverable D5.3: Upgrade of industrial loads, aggregators and RES plant and implementation of grid devices. A brief synthesis of this implementation is provided below.

Aucun texte alternatif pour cette image

 

Demand-Side Response (DSR):

Five out of seven industrial site are now fully upgraded by ABB with the support of the aggregators (COMPENDIA, ENEL X and EDISON) and will commence congestion management and Automatic Voltage Control (AVC) test. The remaining two will be soon available as the demo starts.

Based upon the flexibilities analysis previously conducted, two sites will test Automatic Frequency Restoration Reserves (a-FRR) provision, two sites will test AVC provision and all of them will test Congestion Management, except the military base.

  • Congestion Management offers will be presented to the zonal Energy Management System and hence accepted automatically by an optimization algorithm.
  • AVC will be tested locally and with the sending either of a V or of a Q setpoints directly from Terna control center.
  • On the contrary, a-FRR will be tested only locally, given the early stage of this service provision with respect to the others.

One of the key findings of the on-site implementation activities was that there are several constraints to respect, such as risks related to cybersecurity and/or unauthorized access, as well as radio interference with other equipments presented in the factories. Also, the activities proved to be more demanding than it seemed, due to the heavy need of retrofit of the sites (lack of connectivity infrastructures and automation devices in old plants). Overall, WP5 manage to overcome most of these barriers and enabled as much flexibility from DSR as it could.

Renewable energy sources (RES):

The two wind power plants are ready to execute local and remote tests for AVC (local test already conducted). As for DSR, Terna will send setpoints directly from its control center for the remote tests. Synthetic Inertia is fully implemented for Pietragalla Power plant, while tests are still running with the provider of the wind turbines of Vaglio. The main difference in this delay is that Pietragalla will provide inertia with its battery energy storate system (BESS), hence the implementation, although innovative, was somehow quicker to implement, since only software solutions were to be developed (measurement and filtering of Rate Of Change Of Frequency, control loops, etc.). On the other hand, Vaglio will provide inertia directly with the regulation of the wind turbines: this required, in addition to the control system upgrades, a series of tests that are still ongoing on the manufacturer facility, to see how much stress can the wind rotor and wings handle. These tests were partially slowed down by Covid-19. Overall, there is no risk of delays since AVC tests will be run first in the overall test campaign, allowing more time for synthetic inertia tests.

Dynamic Thermal Rating:

Thirteen commercial MICCA devices were purchased and installed on Terna’s seven backbones. These sensors provide essential information for the calibration of the two innovative DTR methods implemented: the sensor based approach, which required the installation of 6 sensor nodes, and the weather based approach, in which no weather measurement is used, but only weather forecasts, thus reducing the number of sensor to be needed. No particular challenge was found concerning this task, but many maintenance issues have occurred afterwards, including damages by the local fauna. While this type of systems is extremely capital light with respect to the realization of new power lines, indeed it requires additional maintenance.

After the completion of Task 5.3 and Task 5.4 “Energy Management System implementation”, the Italian demonstrator is now ready to begin with the test phase.

]]>
New video on WP6 demonstration /new-video-on-wp6-demonstration/ Thu, 20 May 2021 07:39:24 +0000 /?p=1554 Read more New video on WP6 demonstration ]]> Discover the video that introduces the demonstration led by ELES addressing close-to-real-time optimization of generation, storage, demand & grid resources on both sides of the Italian-Slovenian border. The partners involved in this demonstration are: ELES, Terna, RTE, Holding Slovenske elektrarne, ENEL, Hydro Dolomiti Energia, Engineering (ENG), Fondazione Bruno Kessler, Elektroenergetski koordinacioni centar (EKC).

]]>
New milestone reached: first market simulations available /new-milestone-reached-first-market-simulations-available/ Mon, 17 Aug 2020 12:46:42 +0000 /?p=1179 Read more New milestone reached: first market simulations available ]]> OSMOSE addresses the optimal development of flexibilities within the overall energy system in order to allow an increasing share of RES within the power network. In WP1, three different scenarios were developed for the future of the European energy system. For each of them, an optimal mix of flexibilities in load, generation, and power flows was identified.

WP2 aims to propose some market designs and regulations that would best enable these optimal flexibility mixes. Market simulations are carried out based on WP1 proposed flexibility mixes, which will allow, at the end of WP2, to assess the most suitable market and regulation options. As a first step in WP2, the generation, load and power flow capacities predefined in WP1 are implemented into an existing electricity market model while comparing different market designs. To that end, University of Duisburg-Essen (UDE) utilizes a fundamental electricity market model, the so-called Joint Market Model (JMM), with a zonal and nodal market design. This detailed model allows to depict for instance technical restrictions of renewable and conventional power generating units, reserve and local heat markets. In the process of WP2, extensions to the market model, like flow-based market coupling and wind forecast errors, are also considered in additional case studies.

The preliminary results presented in the document downloadable below give a taste of UDE’s achievements within WP2. Results based on RTE’s agent-based model will be available later on. Note that the model runs are still work in progress and the results presented in the document are not to be regarded as final results.

OSMOSE Milestone 2.2 presentation.

]]>