Version | 1.0 |
---|---|
Download | 132 |
Total Views | 85 |
Stock | ∞ |
File Size | 1.71 MB |
File Type | |
Create Date | 21 June 2019 |
Last Updated | 21 June 2019 |
This report maps out the long-term development of the European power system and aims to provide a basis for subsequent studies on the arising need for flexibility in the OSMOSE project. For this purpose, three scenarios named “Current Goals Achieved” (CGA), “Accelerated Transformation” (AT), and “Neglected Climate Action” (NCA) are introduced.
Model calculations determine, for each scenario, the development of the overall energy system and, in greater detail, that of power system supply and demand.